Barangay
One barangay's record, drawn only from what is compiled: the PSA boundary release, the municipal profile, and the datasets this portal carries. 15.85 km² of land, number 11 of 52 barangays by area.
Land area
15.85km²
Rank 11 of 52 by land area
Share of Labo
2.52%
15.85 km² of Labo's 628.71 km²
Population
Not available
No barangay-level PSA census extract is wired yet — see below
From the municipal centroid
4.9km
north-west of the area-weighted municipal centroid
The record
Where it is
The centroid is the geometric centre of the barangay polygon, not the barangay hall.
Nearest barangays
Straight-line distance between polygon centroids — the five closest, and which way they lie.
Land area in context
Measured against the 628.71 km² the compiled barangay polygons add up to, of which Baay alone holds 65.65 km². The municipal total is the sum of these polygons, not a separately published figure.
Population · not available
No barangay-level PSA census extract is published on data.bettergov.ph. Place an official PSA Census of Population file at data/sources/psa-population.csv (headers: psgc_code,population,source,year) and re-run `npm run etl barangays` to attach it.
A barangay with no source keeps the field empty. Population is never inferred from the municipal total, from the land area, or from a neighbouring barangay.
Applies to Exciban.
Census coverage
0.0%
0 of 52 barangays have a population figure
Infrastructure
The DPWH transparency dataset is municipality-level: a row names a locality, an implementing office and a legislative district. A project is attributed to a barangay here only when the source itself names one.
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGKAWAYAN-LABO DIVERSION ROAD,(LABO SECTION), CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT
Bridges · Completed · A.C. RIVERO DEVELOPMENT CORPORATION (5122)
2020
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD, LABO SECTION, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT
Roads · On-Going · ALGIMAR CONSTRUCTION CORPORATION (15232) / SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION) (11597)
2023
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY PASS AND DIVERSION ROADS - TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION) PACKAGE 1, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT
Roads · Completed · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
2022
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION)PACKAGE 1, CAMARINES NORTE, LABO, CAMARINES NORTE (1ST LEGISLATIVE
Roads · On-Going · EUS CONSTRUCTION (21878)
2024
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY PASS AND DIVERSION ROADS - TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION) PACKAGE 2, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT
Roads · Completed · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
2022
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BY-PASS AND DIVERSION ROA
Roads · On-Going · EUS CONSTRUCTION (21878)
2025
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD, LABO SECTION, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT
Roads · Completed · EUS CONSTRUCTION (21878)
2021
CONSTRUCTION OF BRIDGE, BARANGAY EXCIBAN, LABO, CAMARINES NORTE
Bridges · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) / BRENTMIN ROOFING ENTERPRISE (37191)
2024
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO-DIVERSION ROAD (LABO SECTION) PACKAGE 3, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT
Roads · Completed · EUS CONSTRUCTION (21878)
2022
ROAD OPENING/CONSTRUCTION OF PUROK 6 TO PUROK 7 BARANGAY ROAD, BRGY. EXCIBAN, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
2020
CONCRETING OF BRGY. EXCIBAN FMR, BRGY. EXCIBAN, LABO, CAMARINES NORTE
Roads · On-Going · GREAT WALL ENGINEERING (34573)
2024
CONCRETING OF BRGY. EXIBAN FMR, BRGY. EXIBAN, LABO, CAMARINES NORTE
Roads · Completed · MPT CONSTRUCTION (43828)
2021
CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING (7.00M X 18.00M PLUS 2.50M CORRIDOR) WITH TOILET AT EACH CLASSROOM, AGAPITO RACELIS ELEMENTARY SCHOOL, BRGY. EXCIBAN, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · GREAT WALL ENGINEERING (34573)
2023
CONSTRUCTION OF BOX CULVERT, BARANGAY BAGONG SILANG 3, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
2025
Participation
Drainage and flooding, roads, waste collection, water, streetlights, disaster response, health and social services all route through the reporting form. It opens with this barangay already selected.
Report an issue in ExcibanThis portal is not an emergency channel. In a life-threatening emergency, call 911 or the MDRRMO hotline directly.
Provenance
No barangay population source is wired: PSA publishes barangay-level census data as publications, not as a dataset on data.bettergov.ph. Place data/sources/psa-population.csv (psgc_code,population,source,year) and re-run to attach it.
Boundary polygons derived from PSA Philippine Standard Geographic Code snapshots (2023-10-24) and NAMRIA administrative-boundary shapefiles (v2023-11-06), packaged by Manuel Balmeo. Areas are the upstream AREA_SQKM values; they are not recomputed from the simplified geometry, so a recomputed area will differ slightly.