Barangay
One barangay's record, drawn only from what is compiled: the PSA boundary release, the municipal profile, and the datasets this portal carries. 5.81 km² of land, number 35 of 52 barangays by area.
Land area
5.81km²
Rank 35 of 52 by land area
Share of Labo
0.92%
5.81 km² of Labo's 628.71 km²
Population
Not available
No barangay-level PSA census extract is wired yet — see below
From the municipal centroid
14.6km
east of the area-weighted municipal centroid
The record
Where it is
The centroid is the geometric centre of the barangay polygon, not the barangay hall.
Nearest barangays
Straight-line distance between polygon centroids — the five closest, and which way they lie.
Land area in context
Measured against the 628.71 km² the compiled barangay polygons add up to, of which Baay alone holds 65.65 km². The municipal total is the sum of these polygons, not a separately published figure.
Population · not available
No barangay-level PSA census extract is published on data.bettergov.ph. Place an official PSA Census of Population file at data/sources/psa-population.csv (headers: psgc_code,population,source,year) and re-run `npm run etl barangays` to attach it.
A barangay with no source keeps the field empty. Population is never inferred from the municipal total, from the land area, or from a neighbouring barangay.
Applies to Mabilo II.
Census coverage
0.0%
0 of 52 barangays have a population figure
Infrastructure
The DPWH transparency dataset is municipality-level: a row names a locality, an implementing office and a legislative district. A project is attributed to a barangay here only when the source itself names one.
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG
Unprogrammed Appropriations 2024 · On-Going · EUS CONSTRUCTION (21878)
2024
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MABILO 2 - MABILO 1, LABO CAMARINES NORTE
Flood Control and Drainage · Completed · BRENTMIN ROOFING ENTERPRISE (37191)
2021
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MATOGDON RIVER FLOOD MITIGATION STRUCTURE IN BR
Flood Control and Drainage · On-Going · EUS CONSTRUCTION (21878)
2024
CONSTRUCTION OF LABO RIVER CONTROL STRUCTURE (MABILO SECTION), BRGY. MABILO, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · BRENTMIN ROOFING ENTERPRISE (37191)
2022
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 2) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINES
Flood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004)
2023
CONSTRUCTION OF RIVER CONTROL, BARANGAY MABILO I - BARANGAY SAN ANTONIO, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · BRENTMIN ROOFING ENTERPRISE (37191)
2022
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 1) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004)
2023
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MABILO II SECTION, LABO CAMARINES NORTE
Flood Control and Drainage · Completed · KV CONSTRUCTION & SUPPLY CORP. (FORMERLY KV CONSTRUCTION & SUPPLY) (17509)
2020
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MATOGDON RIVER FLOOD MITIGATION STRUCTURE IN BR
Flood Control and Drainage · On-Going · EUS CONSTRUCTION (21878)
2024
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. MABILO 1, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · BRENTMIN ROOFING ENTERPRISE (37191)
2022
CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MABILO II, LABO, CAMARINES NORTE (LABO RIVER)
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
2022
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, LABO, CAMARINES NORTE, MABILO II AND MASALONG, LABO, CAM
Water Provision and Storage · On-Going · GOLDEN TILLER CONSTRUCTION AND SUPPLY (44391)
2023
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MABILO II, LABO, CAMARINES NORTE
Buildings and Facilities · On-Going · GOLDEN CONSTRUCTION AND SUPPLY (35001)
2023
CONST. OF MULTI-PURPOSE BLDG., BRGY. MABILO II, LABO CAMS. NORTE
Buildings and Facilities · Completed · VARIN CONSTRUCTION AND HARDWARE SUPPLY (FORMERLY: VC VARIN CONSTRUCTION AND HARDWARE SUPPLY) (12475)
2018
COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY MABILO 2, LABO, CAMARINES NORTE
Buildings and Facilities · On-Going · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
2025
Participation
Drainage and flooding, roads, waste collection, water, streetlights, disaster response, health and social services all route through the reporting form. It opens with this barangay already selected.
Report an issue in Mabilo IIThis portal is not an emergency channel. In a life-threatening emergency, call 911 or the MDRRMO hotline directly.
Provenance
No barangay population source is wired: PSA publishes barangay-level census data as publications, not as a dataset on data.bettergov.ph. Place data/sources/psa-population.csv (psgc_code,population,source,year) and re-run to attach it.
Boundary polygons derived from PSA Philippine Standard Geographic Code snapshots (2023-10-24) and NAMRIA administrative-boundary shapefiles (v2023-11-06), packaged by Manuel Balmeo. Areas are the upstream AREA_SQKM values; they are not recomputed from the simplified geometry, so a recomputed area will differ slightly.