Barangay
One barangay's record, drawn only from what is compiled: the PSA boundary release, the municipal profile, and the datasets this portal carries. 14.57 km² of land, number 13 of 52 barangays by area.
Land area
14.57km²
Rank 13 of 52 by land area
Share of Labo
2.32%
14.57 km² of Labo's 628.71 km²
Population
Not available
No barangay-level PSA census extract is wired yet — see below
From the municipal centroid
19.3km
west of the area-weighted municipal centroid
The record
Where it is
The centroid is the geometric centre of the barangay polygon, not the barangay hall.
Nearest barangays
Straight-line distance between polygon centroids — the five closest, and which way they lie.
Land area in context
Measured against the 628.71 km² the compiled barangay polygons add up to, of which Baay alone holds 65.65 km². The municipal total is the sum of these polygons, not a separately published figure.
Population · not available
No barangay-level PSA census extract is published on data.bettergov.ph. Place an official PSA Census of Population file at data/sources/psa-population.csv (headers: psgc_code,population,source,year) and re-run `npm run etl barangays` to attach it.
A barangay with no source keeps the field empty. Population is never inferred from the municipal total, from the land area, or from a neighbouring barangay.
Applies to Tigbinan.
Census coverage
0.0%
0 of 52 barangays have a population figure
Infrastructure
The DPWH transparency dataset is municipality-level: a row names a locality, an implementing office and a legislative district. A project is attributed to a barangay here only when the source itself names one.
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY ANAHAW - BARANGAY MALASUGUI, LABO, CAMARINES NORTE (BUSIGON RIVER)
Flood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
CONSTRUCTION OF ROAD AT BARANGAY TIGBINAN, LABO, CAMARINES NORTE
Roads · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER, PHASE I, BARANGAY TIGBINAN, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
CONSTRUCTION OF ROAD AT BRGY. DAGANG, PARACALE, CAMARINES NORTE (PHASE III)
Bridges, Roads · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
CONSTRUCTION OF ROAD, BRGY. TIGBINAN, LABO, CAMARINES NORTE (PHASE 1)
Roads · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-DAGOOK BR. 1 (B02702LZ) ALONG MAHARLIKA HIGHWAY, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)
Bridges · On-Going · I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR (10410)
2025
REPLACEMENT OF PERMANENT WEAK BRIDGES - TIGBINAN BR. (B02701LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. TIGBINAN, LABO, CAMARINES NORTE
Bridges · On-Going · WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
2023
CONSTRUCTION OF ROAD AT BRGY. TIGBINAN, LABO, CAMARINES NORTE (PHASE III)
Roads · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - DAGOOK BR. 2 (B02703LZ) ALONG MAHARLIKA HIGHWAY, TIGBINAN, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)
Bridges · On-Going · WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) (21921)
2025
CONSTRUCTION OF FLOOD CONTROL AT BRGY. TIGBINAN, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
2023
CONSTRUCTION OF FLOOD CONTROL / MITIGATION AT BRGY. TIGBINAN, LABO, CAMARINES NORTE (PHASE 5), BRGY. TIGBINAN, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (LZ) K0284+000-K0284+578, BRGY.
Roads · Completed · SHEAR CONSTRUCTION AND SUPPLY (34027) / RUR CONSTRUCTION AND SUPPLY (35881)
2019
CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS: REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, DAGOOC BRIDGE 1 (B02702LZ) ALONG DAANG MAHARLIKA (LZ), LABO, CAMARINES NROTE
Bridges · Completed · HGG BUILDERS & SUPPLY (17824)
2016
CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING, F. CAUDILLA ES, LABO CAMS. NORTE
Buildings and Facilities · Completed · GOLDEN EGG BUILDER (37214)
2018
CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, GUISICAN BRGY. ROAD CONNECTING DAANG MAHARLIKA IN SUPPORT OF GUISICAN MPC SANKAKA PRODUCTION AREA, BRGY. GUISICAN, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
2023
REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS DAANG MAHARLIKA (LZ) - K0281+530 - K0281+ 556, LABO, CAMARINES NORTE
Roads · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
2023
Participation
Drainage and flooding, roads, waste collection, water, streetlights, disaster response, health and social services all route through the reporting form. It opens with this barangay already selected.
Report an issue in TigbinanThis portal is not an emergency channel. In a life-threatening emergency, call 911 or the MDRRMO hotline directly.
Provenance
No barangay population source is wired: PSA publishes barangay-level census data as publications, not as a dataset on data.bettergov.ph. Place data/sources/psa-population.csv (psgc_code,population,source,year) and re-run to attach it.
Boundary polygons derived from PSA Philippine Standard Geographic Code snapshots (2023-10-24) and NAMRIA administrative-boundary shapefiles (v2023-11-06), packaged by Manuel Balmeo. Areas are the upstream AREA_SQKM values; they are not recomputed from the simplified geometry, so a recomputed area will differ slightly.