Infrastructure
Infrastructure rows the Department of Public Works and Highways records against the Municipality of Labo, compiled by this portal's ETL from the DPWH transparency dataset.
Rows compiled
309
One row per project record
Total recorded amount
₱10.76B
309 of 309 rows carry an amount
Largest single contract
₱161.45M
The highest amount in the compiled rows
Barangays named
50
Rows that name a barangay — the source does this for a minority of projects
Scope · municipality-level
The DPWH transparency dataset records a project against a locality — the municipality — plus an implementing office and a legislative district. It does not carry a barangay column for every project, and it does not carry per-barangay totals at all.
A row is attributed to a barangay on this portal only when the source itself names one in its barangay field. Nothing is assigned to a barangay from a coordinate, from a contractor’s address, or from guesswork.
So a barangay with no matching row is not a barangay with no public works — it is a barangay the source did not name. The per-barangay page says exactly that.
Records
Search, then narrow by year or status. Every filter is a plain link, so a filtered view works without JavaScript and can be shared as-is.
Provenance
Infrastructure project data from the official DPWH transparency platform, packaged by BetterGov.ph.
Municipality-level rows, as published: figure totals describe Labo as a whole and cannot be read as a barangay’s budget. The AIP is published per-LGU as a PDF on the LGU website, not as a structured dataset. The FDPP explorer links to the source document instead of transcribing it.
29 of 309 rows₱570,538,822.76 in the rows shownFiltered view — the address bar holds the exact query.
NETWORK DEVELOPMENT-CONST. OF BY PASSES AND DIVERSION ROADS; LABO BY PASS ROAD INCL. ROW, CAMARINES
Roads · Completed · PARTIDO CONSTRUCTION & SUPPLY (20631)
MalasuguiRegular Infra - GAA 2018 OO-118FC0134
NETWORK DEVELOPMENT PROGRAM; CONST. OF BY-PASS AND DIVERSION ROADS, TAGKAWAYAN-LABO DIVERSION ROAD,
Roads · Completed · PARTIDO CONSTRUCTION & SUPPLY (20631)
DumagmangRegular Infra - GAA 2018 OO-118FC0135
001-ASSET PRESERVATION PROGRAM: REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS, PRIMARY ROADS, DAA
Roads · Completed · NFH CONSTRUCTION & SUPPLY (16055)
Bagong Silang IRegular Infra - GAA 2018 OO-118FC0061
NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROAD DAANG MAHARLIKA (LZ) K0321+452-K0322+592 & K0322+630-
Roads · Completed · O.L. DE LEON CONSTRUCTION (16194)
TalobatibRegular Infra - GAA 2018 OO-118FC0039
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHAB./IMPROVEMENT OF MANGCAMAGON
Flood Control and Drainage · Completed · A.C. RIVERO DEVELOPMENT CORPORATION (5122)
MasalongRegular Infra - GAA 2018 OO-218FC0159
BRIDGE PROGRAM; CONST. OF NEW PERMANENT BRIDGE; CALABACA BRIDGE ALONG STA. ELENA-CAPALONGA BY PASS C
Bridges · Completed · EUS CONSTRUCTION (21878)
AnameamRegular Infra - GAA 2018 OO-118FC0060
REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA (LZ)
Roads · Completed · B2K LUMBER, CONSTRUCTION SUPPLIES AND SERVICES (33069)
MalatapRegular Infra - GAA 2018 OO-118FC0097
CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING, F. CAUDILLA ES, LABO CAMS. NORTE
Buildings and Facilities · Completed · GOLDEN EGG BUILDER (37214)
TigbinanOutside Infra - GAA 2018 DepEd BEFF18FC0178
ORG. OUTCOME 1: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES; MAG-ATIP BRIDGE (B02707LZ) ALONG DAAN
Bridges · Completed · EUS CONSTRUCTION (21878)
Bagong Silang IRegular Infra - GAA 2018 OO-118FC0101
CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, DUMAGMANG INTEGRATED SCHOOL, LAB
Buildings and Facilities · Completed · RUR CONSTRUCTION AND SUPPLY (35881)
DumagmangOutside Infra - GAA 2018 DepEd BEFF18FC0176
CONCRETING OF CALABASA FMR, BRGY. CALABASA, LABO CAMARINES NORTE
Roads · Completed · R.G. VILLAFUERTE CONSTRUCTION (29949)
CalabasaOutside Infra - GAA 2018 DA FMR18FC0146
CONCRETING OF CABATUHAN FMR, BRGY. CABATUHAN, LABO CAMARINES NORTE
Roads · Completed · SGQ CONSTRUCTION AND SUPPLY (34800)
CabatuhanOutside Infra - GAA 2018 DA FMR18FC0143
CONCRETING OF MALASUGUI FMR, BRGY. MALASUGUI, LABO CAMARINES NORTE
Roads · Completed · YSA CONSTRUCTION AND SUPPLY (33968)
MalasuguiOutside Infra - GAA 2018 DA FMR18FC0144
CONCRETING OF PANGPANG FMR, BRGY. PANGPANG, LABO CAMARINES NORTE
Roads · Completed · RUR CONSTRUCTION AND SUPPLY (35881)
PangpangOutside Infra - GAA 2018 DA FMR18FC0142
CONCRETING OF MALACBANG FMR, BRGY. MALACBANG, PARACALE CAMARINES NORTE
Roads · Completed · NFH CONSTRUCTION & SUPPLY (16055)
PangpangOutside Infra - GAA 2018 DA FMR18FC0145
CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING, TULAY NA LUPA NATIONAL HIGH SCHO
Buildings and Facilities · Completed · VARIN CONSTRUCTION AND HARDWARE SUPPLY (FORMERLY: VC VARIN CONSTRUCTION AND HARDWARE SUPPLY) (12475)
Tulay Na LupaOutside Infra - GAA 2018 DepEd BEFF18FC0233
CONSTRUCTION OF SEVENTEEN (17) UNIT REINF. CONC. RAIN COLLECTOR SYSTEM (RWCS), LABO, PARACALE, DAET
Water Provision and Storage · Completed · BRENTMIN ROOFING ENTERPRISE (37191)
AnameamRegular Infra - GAA 2018 Other Infrastructure (CSSP)18FC0170
CONST. OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING, NAPAOD ELEM. SCHOOL, LABO CAMS. NORTE
Buildings and Facilities · Completed · O.L. DE LEON CONSTRUCTION (16194)
BenitOutside Infra - GAA 2018 DepEd BEFF18FC0217
RELOCATION / COMPLETION OF RHU LABO, RHU III, LABO CAMARINES NORTE
Buildings and Facilities · Completed · RUR CONSTRUCTION AND SUPPLY (35881)
Bagong Silang IOutside Infra - GAA 2018 DOH HFEP18FC0192
CONST. OF HANGING BRIDGE, BRGY. CABATUHAN, LABO CAMS. NORTE
Bridges · Completed · 128 DRAGON CONSTRUCTION AND SUPPLIES (35408)
CabatuhanRegular Infra - GAA 2018 LP18FC0131
CONST. OF MULTI-PURPOSE BLDG., BRGY. MABILO II, LABO CAMS. NORTE
Buildings and Facilities · Completed · VARIN CONSTRUCTION AND HARDWARE SUPPLY (FORMERLY: VC VARIN CONSTRUCTION AND HARDWARE SUPPLY) (12475)
Mabilo IIRegular Infra - GAA 2018 LP18FC0110
CONST. OF MULTI-PURPOSE BUILDING, BRGY. TULAY NA LUPA, LABO CAMS. NORTE
Buildings and Facilities · Completed · MPACKS BUILDERS (40390)
Tulay Na LupaRegular Infra - GAA 2018 LP18FC0005
CONCRETING OF ROADS, BRGY. BAYAN-BAYAN, LABO CAMS. NORTE
Roads · Completed · GREAT WALL ENGINEERING (34573)
Bayan-bayanRegular Infra - GAA 2018 LP18FC0078
CONSTRUCTION OF LOCAL ROADS, BRGY. CABATUHAN, LABO CAMARINES NORTE
Roads · Completed · BRENTMIN ROOFING ENTERPRISE (37191)
CabatuhanRegular Infra - GAA 2018 LP18FC0161
CONCRETING OF ROAD, PUROK 1 DULUHAN, BRGY. PAG-ASA, LABO CAMS. NORTE
Roads · Completed · YAKAL CONSTRUCTION AND SUPPLY (39325)
CalabasaRegular Infra - GAA 2018 LP18FC0077
REHAB. OF MULTI-PURPOSE BUILDING
Buildings and Facilities · Completed · KENZOLE CONSTRUCTION AND GENERAL MERCHANDISE (39300)
DalasRegular Infra - GAA 2018 LP18FC0109
CONST. (COMPLETION) OF MULTI-PURPOSE BLDG., BRGY. SUBMAKIN, LABO CAMS. NORTE
Buildings and Facilities · Completed · YAKAL CONSTRUCTION AND SUPPLY (39325)
SubmakinRegular Infra - GAA 2018 LP18FC0112
CONST. OF MULTI-PURPOSE BUILDING, BRGY. AWITAN, LABO CAMS. NORTE
Buildings and Facilities · Completed · MPACKS BUILDERS (40390)
AwitanRegular Infra - GAA 2018 LP18FC0006
CONST. OF MULTI-PURPOSE BLDG., /COVERED COURT, BJMP, BRGY. MASALONG, LABO CAMS. NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
MasalongRegular Infra - GAA 2018 LP18FC0111
| Talobatib |
| ₱65,513,380.25 |
| 2018 |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHAB./IMPROVEMENT OF MANGCAMAGONFlood Control and Drainage · Completed · A.C. RIVERO DEVELOPMENT CORPORATION (5122) | Masalong | ₱59,595,088.98 | 2018 |
|---|
| BRIDGE PROGRAM; CONST. OF NEW PERMANENT BRIDGE; CALABACA BRIDGE ALONG STA. ELENA-CAPALONGA BY PASS CBridges · Completed · EUS CONSTRUCTION (21878) | Anameam | ₱55,901,681.46 | 2018 |
|---|
| REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA (LZ)Roads · Completed · B2K LUMBER, CONSTRUCTION SUPPLIES AND SERVICES (33069) | Malatap | ₱27,481,471.69 | 2018 |
|---|
| CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING, F. CAUDILLA ES, LABO CAMS. NORTEBuildings and Facilities · Completed · GOLDEN EGG BUILDER (37214) | Tigbinan | ₱16,418,483.38 | 2018 |
|---|
| ORG. OUTCOME 1: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES; MAG-ATIP BRIDGE (B02707LZ) ALONG DAANBridges · Completed · EUS CONSTRUCTION (21878) | Bagong Silang I | ₱13,970,496.04 | 2018 |
|---|
| CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, DUMAGMANG INTEGRATED SCHOOL, LABBuildings and Facilities · Completed · RUR CONSTRUCTION AND SUPPLY (35881) | Dumagmang | ₱10,153,473.36 | 2018 |
|---|
| CONCRETING OF CALABASA FMR, BRGY. CALABASA, LABO CAMARINES NORTERoads · Completed · R.G. VILLAFUERTE CONSTRUCTION (29949) | Calabasa | ₱9,448,770.79 | 2018 |
|---|
| CONCRETING OF CABATUHAN FMR, BRGY. CABATUHAN, LABO CAMARINES NORTERoads · Completed · SGQ CONSTRUCTION AND SUPPLY (34800) | Cabatuhan | ₱4,754,170.39 | 2018 |
|---|
| CONCRETING OF MALASUGUI FMR, BRGY. MALASUGUI, LABO CAMARINES NORTERoads · Completed · YSA CONSTRUCTION AND SUPPLY (33968) | Malasugui | ₱4,740,463.44 | 2018 |
|---|
| CONCRETING OF PANGPANG FMR, BRGY. PANGPANG, LABO CAMARINES NORTERoads · Completed · RUR CONSTRUCTION AND SUPPLY (35881) | Pangpang | ₱4,735,435.04 | 2018 |
|---|
| CONCRETING OF MALACBANG FMR, BRGY. MALACBANG, PARACALE CAMARINES NORTERoads · Completed · NFH CONSTRUCTION & SUPPLY (16055) | Pangpang | ₱4,717,611.59 | 2018 |
|---|
| CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING, TULAY NA LUPA NATIONAL HIGH SCHOBuildings and Facilities · Completed · VARIN CONSTRUCTION AND HARDWARE SUPPLY (FORMERLY: VC VARIN CONSTRUCTION AND HARDWARE SUPPLY) (12475) | Tulay Na Lupa | ₱4,381,720.07 | 2018 |
|---|
| CONSTRUCTION OF SEVENTEEN (17) UNIT REINF. CONC. RAIN COLLECTOR SYSTEM (RWCS), LABO, PARACALE, DAETWater Provision and Storage · Completed · BRENTMIN ROOFING ENTERPRISE (37191) | Anameam | ₱3,225,066.95 | 2018 |
|---|
| CONST. OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING, NAPAOD ELEM. SCHOOL, LABO CAMS. NORTEBuildings and Facilities · Completed · O.L. DE LEON CONSTRUCTION (16194) | Benit | ₱3,137,658.22 | 2018 |
|---|
| RELOCATION / COMPLETION OF RHU LABO, RHU III, LABO CAMARINES NORTEBuildings and Facilities · Completed · RUR CONSTRUCTION AND SUPPLY (35881) | Bagong Silang I | ₱1,947,930.97 | 2018 |
|---|
| CONST. OF HANGING BRIDGE, BRGY. CABATUHAN, LABO CAMS. NORTEBridges · Completed · 128 DRAGON CONSTRUCTION AND SUPPLIES (35408) | Cabatuhan | ₱1,940,398.03 | 2018 |
|---|
| CONST. OF MULTI-PURPOSE BLDG., BRGY. MABILO II, LABO CAMS. NORTEBuildings and Facilities · Completed · VARIN CONSTRUCTION AND HARDWARE SUPPLY (FORMERLY: VC VARIN CONSTRUCTION AND HARDWARE SUPPLY) (12475) | Mabilo II | ₱1,934,401.57 | 2018 |
|---|
| CONST. OF MULTI-PURPOSE BUILDING, BRGY. TULAY NA LUPA, LABO CAMS. NORTEBuildings and Facilities · Completed · MPACKS BUILDERS (40390) | Tulay Na Lupa | ₱1,920,352.50 | 2018 |
|---|
| CONCRETING OF ROADS, BRGY. BAYAN-BAYAN, LABO CAMS. NORTERoads · Completed · GREAT WALL ENGINEERING (34573) | Bayan-bayan | ₱1,888,897.72 | 2018 |
|---|
| CONSTRUCTION OF LOCAL ROADS, BRGY. CABATUHAN, LABO CAMARINES NORTERoads · Completed · BRENTMIN ROOFING ENTERPRISE (37191) | Cabatuhan | ₱1,881,309.55 | 2018 |
|---|
| CONCRETING OF ROAD, PUROK 1 DULUHAN, BRGY. PAG-ASA, LABO CAMS. NORTERoads · Completed · YAKAL CONSTRUCTION AND SUPPLY (39325) | Calabasa | ₱1,860,960.88 | 2018 |
|---|
| REHAB. OF MULTI-PURPOSE BUILDINGBuildings and Facilities · Completed · KENZOLE CONSTRUCTION AND GENERAL MERCHANDISE (39300) | Dalas | ₱972,800.00 | 2018 |
|---|
| CONST. (COMPLETION) OF MULTI-PURPOSE BLDG., BRGY. SUBMAKIN, LABO CAMS. NORTEBuildings and Facilities · Completed · YAKAL CONSTRUCTION AND SUPPLY (39325) | Submakin | ₱970,650.00 | 2018 |
|---|
| CONST. OF MULTI-PURPOSE BUILDING, BRGY. AWITAN, LABO CAMS. NORTEBuildings and Facilities · Completed · MPACKS BUILDERS (40390) | Awitan | ₱969,918.02 | 2018 |
|---|
| CONST. OF MULTI-PURPOSE BLDG., /COVERED COURT, BJMP, BRGY. MASALONG, LABO CAMS. NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Masalong | ₱969,820.92 | 2018 |
|---|