Infrastructure
Infrastructure rows the Department of Public Works and Highways records against the Municipality of Labo, compiled by this portal's ETL from the DPWH transparency dataset.
Rows compiled
309
One row per project record
Total recorded amount
₱10.76B
309 of 309 rows carry an amount
Largest single contract
₱161.45M
The highest amount in the compiled rows
Barangays named
50
Rows that name a barangay — the source does this for a minority of projects
Scope · municipality-level
The DPWH transparency dataset records a project against a locality — the municipality — plus an implementing office and a legislative district. It does not carry a barangay column for every project, and it does not carry per-barangay totals at all.
A row is attributed to a barangay on this portal only when the source itself names one in its barangay field. Nothing is assigned to a barangay from a coordinate, from a contractor’s address, or from guesswork.
So a barangay with no matching row is not a barangay with no public works — it is a barangay the source did not name. The per-barangay page says exactly that.
Records
Search, then narrow by year or status. Every filter is a plain link, so a filtered view works without JavaScript and can be shared as-is.
Provenance
Infrastructure project data from the official DPWH transparency platform, packaged by BetterGov.ph.
Municipality-level rows, as published: figure totals describe Labo as a whole and cannot be read as a barangay’s budget. The AIP is published per-LGU as a PDF on the LGU website, not as a structured dataset. The FDPP explorer links to the source document instead of transcribing it.
35 of 309 rows₱1,009,002,094.28 in the rows shownFiltered view — the address bar holds the exact query.
CONSTRUCTION OF FLOOD CONTROL AT BARANGAY GUISICAN, LABO, CAMARINES NORTE (PHASE 8), BRGY. GUISICAN, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
GuisicanRegular Infra - GAA 2023 CSSP23FC0080
CONSTRUCTION OF ROAD, BRGY. MAHAWANHAWAN - BRGY. MASALONG, LABO, CAMARINES NORTE
GAA 2023 CSSP · Completed · EUS CONSTRUCTION (21878)
MasalongRegular Infra - GAA 2023 CSSP23FC0046
CONSTRUCTION OF FARM TO MARKET ROAD, BRGY. CALABASA - BRGY. BAAY (PHASE IV), LABO, CAMARINES NORTE, BRGY. CALABASA, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
BaayRegular Infra - GAA 2023 CSSP23FC0022
CONSTRUCTION OF FLOOD CONTROL, CALABASA (PHASE IV), LABO, CAMARINES NORTE, BRGY. CALABASA, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
CalabasaRegular Infra - GAA 2023 CSSP23FC0041
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. SAN ANTONIO, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · PARTIDO CONSTRUCTION & SUPPLY (20631)
San AntonioRegular Infra - GAA 2023 CSSP23FC0042
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIG-ON RIVER (DOWNSTREAM) PHASE II, BRGY. STA. CRUZ, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
Santa CruzRegular Infra - GAA 2023 CSSP23FC0049
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 2) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINES
Flood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004)
Mabilo IIRegular Infra - GAA 2023 CSSP23FC0062
PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0289+943 - K0290+435, K0298+714 - K0299+326, K0300+000-K0300+733, K0302+512-K0302+935, LABO, CAMARINES NORTE
Roads · Completed · NFH CONSTRUCTION & SUPPLY (16055)
Bagong Silang IRegular Infra - GAA 2023 OO-123FC0028
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 4), BRGY. SAN ANTONIO, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004)
San AntonioRegular Infra - GAA 2023 CSSP23FC0045
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 1) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004)
Mabilo IIRegular Infra - GAA 2023 CSSP23FC0061
REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS BAGONG SILANG - CAPALONGA RD - K0306+105 - K0306+929, K0308+260 - K0309+776, BAGONG SILANG - CAPALONGA RD, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
Bagong Silang IIRegular Infra - GAA 2023 OO-123FC0004
CONSTRUCTION OF ROAD, BARANGAY BENIT - BARANGAY NAPAOD, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
BenitRegular Infra - GAA 2023 CSSP23FC0034
CONSTRUCTION OF FLOOD CONTROL AT BRGY. TIGBINAN, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
TigbinanRegular Infra - GAA 2023 CSSP23FC0081
REPLACEMENT OF PERMANENT WEAK BRIDGES - BINUANG BR. (B02712LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. DAGUIT, LABO, CAMARINES NORTE
Bridges · Completed · EUS CONSTRUCTION (21878)
DaguitRegular Infra - GAA 2023 OO-123FC0002
REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS DAANG MAHARLIKA (LZ) K0300+449 - K0300+595, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
Bagong Silang III (Silang)Regular Infra - GAA 2023 OO-123FC0055
CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING (7.00M X 18.00M PLUS 2.50M CORRIDOR) WITH TOILET AT EACH CLASSROOM, AGAPITO RACELIS ELEMENTARY SCHOOL, BRGY. EXCIBAN, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · GREAT WALL ENGINEERING (34573)
ExcibanOutside Infra - GAA 2023 DepEd BEFF23FC0097
CONSTRUCTION OF ROAD, BRGY. DUMAGMANG, LABO, CAMARINES NORTE
Roads · Completed · KENZOLE CONSTRUCTION AND GENERAL MERCHANDISE (39300)
DumagmangRegular Infra - GAA 2023 CSSP23FC0082
CONSTRUCTION OF LOCAL ROAD, BRGY. TIGBINAN, LABO, CAMARINES NORTE
Roads · Completed · LAHDETH CONSTRUCTION AND SUPPLY (34833)
CabatuhanRegular Infra - GAA 2023 CSSP23FC0070
CONSTRUCTION OF ROAD, BRGY. MALIBAGO, LABO, CAMARINES NORTE
Roads · Completed · ARIK CONSTRUCTION (32786)
MalibagoRegular Infra - GAA 2023 CSSP23FC0102
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BAYABAS, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
BayabasRegular Infra - GAA 2023 CSSP23FC0073
ASSET PRESERVATION PROGRAM REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BAGONG SILANG - CAPALONGA RD - K0302+644 - K0302+956, BRGY. BAGONG SILANG II, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
Bagong Silang IIRegular Infra - GAA 2023 OO-123FC0003
CONSTRUCTION OF ROAD, BARANGAY CABUSAY, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
CabusayRegular Infra - GAA 2023 CSSP23FC0007
CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, GUISICAN BRGY. ROAD CONNECTING DAANG MAHARLIKA IN SUPPORT OF GUISICAN MPC SANKAKA PRODUCTION AREA, BRGY. GUISICAN, LABO, CAMARINES NORTE
Roads · Completed · EUS CONSTRUCTION (21878)
TigbinanRegular Infra - GAA 2023 CSSP23FC0010
REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS DAANG MAHARLIKA (LZ) - K0281+530 - K0281+ 556, LABO, CAMARINES NORTE
Roads · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
TigbinanRegular Infra - GAA 2023 OO-123FC0068
CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING (7.00 X 18.00M PLUS 2.50M) STANDARD, KABATUHAN INTEGRATED SCHOOL, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · GREAT WALL ENGINEERING (34573)
CabatuhanOutside Infra - GAA 2023 DepEd BEFF23FC0096
REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, MALATAP BR. (B00501LZ) ALONG BAGONG SILANG - CAPALONGA RD, BRGY. BAGONG SILANG II, LABO, CAMARINES NORTE
Bridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
Bagong Silang IIRegular Infra - GAA 2023 OO-123FC0065
CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), ST. JOHN THE APOSTLE ACADEMY, BARANGAY GUMAMELA, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · GREAT WALL ENGINEERING (34573)
Gumamela (Pob.)Regular Infra - GAA 2023 CSSP23FC0009
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUBMAKIN, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · GREAT WALL ENGINEERING (34573)
SubmakinRegular Infra - GAA 2023 CSSP23FC0021
CONSTRUCTION OF ROAD, BARANGAY LUGUI, LABO, CAMARINES NORTE
Roads · Completed · GREAT WALL ENGINEERING (34573)
LuguiRegular Infra - GAA 2023 CSSP23FC0023
CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BARANGAY MALATAP, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
MalatapOutside Infra - Unprogrammed Appropriations 202323FC0113
REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, MALATAP BRIDGE (B02706LZ) ALONG DAANG MAHARLIKA, BRGY. MALATAP, LABO, CAMARINES NORTE
Bridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
MalatapRegular Infra - GAA 2023 OO-123FC0063
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, P-1, BARANGAY MAHAWAN HAWAN, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · GOLDEN CONSTRUCTION AND SUPPLY (35001)
Mahawan-hawanRegular Infra - GAA 2023 CSSP23FC0005
REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, DAGUIT BR. (B02709LZ) ALONG DAANG MAHARLIKA, BRGY. DAGUIT, LABO, CAMARINES NORTE
Bridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
MacogonRegular Infra - GAA 2023 OO-123FC0066
REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, GUISICAN BR. (B04503LZ) ALONG DAANG MAHARLIKA, BRGY. GUISICAN, LABO, CAMARINES NORTE
Bridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
GuisicanRegular Infra - GAA 2023 OO-123FC0047
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (BARANGAY HALL), BARANGAY SUBMAKIN, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · GREAT WALL ENGINEERING (34573)
SubmakinRegular Infra - GAA 2023 CSSP23FC0011
| Calabasa |
| ₱95,479,124.82 |
| 2023 |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. SAN ANTONIO, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · PARTIDO CONSTRUCTION & SUPPLY (20631) | San Antonio | ₱77,004,263.34 | 2023 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIG-ON RIVER (DOWNSTREAM) PHASE II, BRGY. STA. CRUZ, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · EUS CONSTRUCTION (21878) | Santa Cruz | ₱57,279,912.51 | 2023 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 2) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINESFlood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004) | Mabilo II | ₱48,999,703.48 | 2023 |
|---|
| PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0289+943 - K0290+435, K0298+714 - K0299+326, K0300+000-K0300+733, K0302+512-K0302+935, LABO, CAMARINES NORTERoads · Completed · NFH CONSTRUCTION & SUPPLY (16055) | Bagong Silang I | ₱48,999,371.82 | 2023 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 4), BRGY. SAN ANTONIO, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004) | San Antonio | ₱48,969,976.29 | 2023 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 1) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · C.B. GARAY PHILWIDE BUILDERS (6004) | Mabilo II | ₱48,250,000.00 | 2023 |
|---|
| REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS BAGONG SILANG - CAPALONGA RD - K0306+105 - K0306+929, K0308+260 - K0309+776, BAGONG SILANG - CAPALONGA RD, CAMARINES NORTERoads · Completed · EUS CONSTRUCTION (21878) | Bagong Silang II | ₱43,054,650.88 | 2023 |
|---|
| CONSTRUCTION OF ROAD, BARANGAY BENIT - BARANGAY NAPAOD, LABO, CAMARINES NORTERoads · Completed · EUS CONSTRUCTION (21878) | Benit | ₱38,506,440.90 | 2023 |
|---|
| CONSTRUCTION OF FLOOD CONTROL AT BRGY. TIGBINAN, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · EUS CONSTRUCTION (21878) | Tigbinan | ₱29,699,257.64 | 2023 |
|---|
| REPLACEMENT OF PERMANENT WEAK BRIDGES - BINUANG BR. (B02712LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. DAGUIT, LABO, CAMARINES NORTEBridges · Completed · EUS CONSTRUCTION (21878) | Daguit | ₱29,390,721.66 | 2023 |
|---|
| REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS DAANG MAHARLIKA (LZ) K0300+449 - K0300+595, LABO, CAMARINES NORTERoads · Completed · EUS CONSTRUCTION (21878) | Bagong Silang III (Silang) | ₱11,759,996.57 | 2023 |
|---|
| CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING (7.00M X 18.00M PLUS 2.50M CORRIDOR) WITH TOILET AT EACH CLASSROOM, AGAPITO RACELIS ELEMENTARY SCHOOL, BRGY. EXCIBAN, LABO, CAMARINES NORTEBuildings and Facilities · Completed · GREAT WALL ENGINEERING (34573) | Exciban | ₱10,989,362.93 | 2023 |
|---|
| CONSTRUCTION OF ROAD, BRGY. DUMAGMANG, LABO, CAMARINES NORTERoads · Completed · KENZOLE CONSTRUCTION AND GENERAL MERCHANDISE (39300) | Dumagmang | ₱9,899,999.98 | 2023 |
|---|
| CONSTRUCTION OF LOCAL ROAD, BRGY. TIGBINAN, LABO, CAMARINES NORTERoads · Completed · LAHDETH CONSTRUCTION AND SUPPLY (34833) | Cabatuhan | ₱9,899,991.59 | 2023 |
|---|
| CONSTRUCTION OF ROAD, BRGY. MALIBAGO, LABO, CAMARINES NORTERoads · Completed · ARIK CONSTRUCTION (32786) | Malibago | ₱9,899,982.65 | 2023 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BAYABAS, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Bayabas | ₱9,899,092.81 | 2023 |
|---|
| ASSET PRESERVATION PROGRAM REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BAGONG SILANG - CAPALONGA RD - K0302+644 - K0302+956, BRGY. BAGONG SILANG II, LABO, CAMARINES NORTERoads · Completed · EUS CONSTRUCTION (21878) | Bagong Silang II | ₱9,799,972.30 | 2023 |
|---|
| CONSTRUCTION OF ROAD, BARANGAY CABUSAY, LABO, CAMARINES NORTERoads · Completed · EUS CONSTRUCTION (21878) | Cabusay | ₱9,720,425.15 | 2023 |
|---|
| CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, GUISICAN BRGY. ROAD CONNECTING DAANG MAHARLIKA IN SUPPORT OF GUISICAN MPC SANKAKA PRODUCTION AREA, BRGY. GUISICAN, LABO, CAMARINES NORTERoads · Completed · EUS CONSTRUCTION (21878) | Tigbinan | ₱9,709,929.50 | 2023 |
|---|
| REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS DAANG MAHARLIKA (LZ) - K0281+530 - K0281+ 556, LABO, CAMARINES NORTERoads · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Tigbinan | ₱8,623,953.29 | 2023 |
|---|
| CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING (7.00 X 18.00M PLUS 2.50M) STANDARD, KABATUHAN INTEGRATED SCHOOL, LABO, CAMARINES NORTEBuildings and Facilities · Completed · GREAT WALL ENGINEERING (34573) | Cabatuhan | ₱7,690,445.14 | 2023 |
|---|
| REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, MALATAP BR. (B00501LZ) ALONG BAGONG SILANG - CAPALONGA RD, BRGY. BAGONG SILANG II, LABO, CAMARINES NORTEBridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Bagong Silang II | ₱5,700,084.38 | 2023 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), ST. JOHN THE APOSTLE ACADEMY, BARANGAY GUMAMELA, LABO, CAMARINES NORTEBuildings and Facilities · Completed · GREAT WALL ENGINEERING (34573) | Gumamela (Pob.) | ₱4,946,159.61 | 2023 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUBMAKIN, LABO, CAMARINES NORTEBuildings and Facilities · Completed · GREAT WALL ENGINEERING (34573) | Submakin | ₱4,909,889.13 | 2023 |
|---|
| CONSTRUCTION OF ROAD, BARANGAY LUGUI, LABO, CAMARINES NORTERoads · Completed · GREAT WALL ENGINEERING (34573) | Lugui | ₱4,907,988.60 | 2023 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BARANGAY MALATAP, LABO, CAMARINES NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Malatap | ₱4,678,204.50 | 2023 |
|---|
| REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, MALATAP BRIDGE (B02706LZ) ALONG DAANG MAHARLIKA, BRGY. MALATAP, LABO, CAMARINES NORTEBridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Malatap | ₱4,409,898.39 | 2023 |
|---|
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, P-1, BARANGAY MAHAWAN HAWAN, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · GOLDEN CONSTRUCTION AND SUPPLY (35001) | Mahawan-hawan | ₱4,300,548.63 | 2023 |
|---|
| REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, DAGUIT BR. (B02709LZ) ALONG DAANG MAHARLIKA, BRGY. DAGUIT, LABO, CAMARINES NORTEBridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Macogon | ₱3,919,563.13 | 2023 |
|---|
| REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, GUISICAN BR. (B04503LZ) ALONG DAANG MAHARLIKA, BRGY. GUISICAN, LABO, CAMARINES NORTEBridges · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Guisican | ₱3,782,725.43 | 2023 |
|---|
| CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (BARANGAY HALL), BARANGAY SUBMAKIN, LABO, CAMARINES NORTEBuildings and Facilities · Completed · GREAT WALL ENGINEERING (34573) | Submakin | ₱1,920,581.58 | 2023 |
|---|