Barangay
One barangay's record, drawn only from what is compiled: the PSA boundary release, the municipal profile, and the datasets this portal carries. 7.53 km² of land, number 27 of 52 barangays by area.
Land area
7.53km²
Rank 27 of 52 by land area
Share of Labo
1.20%
7.53 km² of Labo's 628.71 km²
Population
Not available
No barangay-level PSA census extract is wired yet — see below
From the municipal centroid
13.3km
east of the area-weighted municipal centroid
The record
Where it is
The centroid is the geometric centre of the barangay polygon, not the barangay hall.
Nearest barangays
Straight-line distance between polygon centroids — the five closest, and which way they lie.
Land area in context
Measured against the 628.71 km² the compiled barangay polygons add up to, of which Baay alone holds 65.65 km². The municipal total is the sum of these polygons, not a separately published figure.
Population · not available
No barangay-level PSA census extract is published on data.bettergov.ph. Place an official PSA Census of Population file at data/sources/psa-population.csv (headers: psgc_code,population,source,year) and re-run `npm run etl barangays` to attach it.
A barangay with no source keeps the field empty. Population is never inferred from the municipal total, from the land area, or from a neighbouring barangay.
Applies to Mabilo I.
Census coverage
0.0%
0 of 52 barangays have a population figure
Infrastructure
The DPWH transparency dataset is municipality-level: a row names a locality, an implementing office and a legislative district. A project is attributed to a barangay here only when the source itself names one.
CONSTRUCTION OF ROAD AT BARANGAY MABILO 1, LABO, CAMARINES NORTE
Roads · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
2025
CONCRETING OF BRGY. MABILO I FMR, BRGY. MABILO I, LABO, CAMARINES NORTE
Roads · Completed · MPT CONSTRUCTION (43828)
2020
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ANTONIO, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
2022
CONSTRUCTION OF MULTI-PURPOSE BUILDING, ANICETA DE LARA PIMENTEL HIGH SCHOOL, BRGY. SAN ANTONIO, MUNICIPALITY OF LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
2022
Participation
Drainage and flooding, roads, waste collection, water, streetlights, disaster response, health and social services all route through the reporting form. It opens with this barangay already selected.
Report an issue in Mabilo IThis portal is not an emergency channel. In a life-threatening emergency, call 911 or the MDRRMO hotline directly.
Provenance
No barangay population source is wired: PSA publishes barangay-level census data as publications, not as a dataset on data.bettergov.ph. Place data/sources/psa-population.csv (psgc_code,population,source,year) and re-run to attach it.
Boundary polygons derived from PSA Philippine Standard Geographic Code snapshots (2023-10-24) and NAMRIA administrative-boundary shapefiles (v2023-11-06), packaged by Manuel Balmeo. Areas are the upstream AREA_SQKM values; they are not recomputed from the simplified geometry, so a recomputed area will differ slightly.