Infrastructure
Infrastructure rows the Department of Public Works and Highways records against the Municipality of Labo, compiled by this portal's ETL from the DPWH transparency dataset.
Rows compiled
309
One row per project record
Total recorded amount
₱10.76B
309 of 309 rows carry an amount
Largest single contract
₱161.45M
The highest amount in the compiled rows
Barangays named
50
Rows that name a barangay — the source does this for a minority of projects
Scope · municipality-level
The DPWH transparency dataset records a project against a locality — the municipality — plus an implementing office and a legislative district. It does not carry a barangay column for every project, and it does not carry per-barangay totals at all.
A row is attributed to a barangay on this portal only when the source itself names one in its barangay field. Nothing is assigned to a barangay from a coordinate, from a contractor’s address, or from guesswork.
So a barangay with no matching row is not a barangay with no public works — it is a barangay the source did not name. The per-barangay page says exactly that.
Records
Search, then narrow by year or status. Every filter is a plain link, so a filtered view works without JavaScript and can be shared as-is.
Provenance
Infrastructure project data from the official DPWH transparency platform, packaged by BetterGov.ph.
Municipality-level rows, as published: figure totals describe Labo as a whole and cannot be read as a barangay’s budget. The AIP is published per-LGU as a PDF on the LGU website, not as a structured dataset. The FDPP explorer links to the source document instead of transcribing it.
33 of 309 rows₱2,047,906,904.50 in the rows shownFiltered view — the address bar holds the exact query.
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE(MVUC) AS PER R.A. 11239-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ)-K0275+000-K0276+024, K0276+510-K0277+000, K0283+000-K02
Roads · On-Going · MUNTOPAR BUILDERS CORP. (29800)
BayabasRegular Infra - GAA 2024 SSP24F00035
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG
Flood Control and Drainage · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) / VGDC CONSTRUCTION AND SUPPLY (45615)
Santa CruzRegular Infra - GAA 2024 OO-224F00190
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE IV), BRGY. MATANLANG, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
MatanlangRegular Infra - GAA 2024 OO-224FC0011
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE III), BRGY. MATANLANG, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
MatanlangRegular Infra - GAA 2024 OO-224FC0010
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 5), BRGY. MATANLANG, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
BenitOutside Infra - Unprogrammed Appropriations 202424FC0076
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 6), BRGY. MATANLANG, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)
BenitOutside Infra - Unprogrammed Appropriations 202424FC0077
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE II), BRGY. LUGUI, LABO, CAMARINES NORTE
Flood Control and Drainage · On-Going · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
LuguiRegular Infra - GAA 2024 OO-224FC0027
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE I), BRGY. LUGUI, LABO, CAMARINES NORTE
Flood Control and Drainage · Completed · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
LuguiRegular Infra - GAA 2024 OO-224FC0014
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG
Unprogrammed Appropriations 2024 · On-Going · EUS CONSTRUCTION (21878)
Mabilo IIOutside Infra - Unprogrammed Appropriations 202424F00507
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY MALATAP, LABO, CAMARIN
Flood Control and Drainage · Completed · EUS CONSTRUCTION (21878)
MalatapRegular Infra - GAA 2024 OO-224F00285
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION)PACKAGE 1, CAMARINES NORTE, LABO, CAMARINES NORTE (1ST LEGISLATIVE
Roads · On-Going · EUS CONSTRUCTION (21878)
ExcibanRegular Infra - GAA 2024 OO-124F00106
CONSTRUCTION OF ROAD, BARANGAY MALANCAO, BASUD, LABO CAMARINES NORTE (PHASE 1), BARANGAY MALANGCAO-BASUD, LABO, CAMARINES NORTE
Roads · On-Going · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)
Malangcao-BasudRegular Infra - GAA 2024 SSP24FC0030
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MATOGDON RIVER FLOOD MITIGATION STRUCTURE IN BR
Flood Control and Drainage · On-Going · EUS CONSTRUCTION (21878)
Mabilo IIRegular Infra - GAA 2024 OO-224F00103
CONSTRUCTION OF BRIDGE, BARANGAY CALABASA, LABO, CAMARINES NORTE
Bridges · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) / BRENTMIN ROOFING ENTERPRISE (37191)
Malangcao-BasudRegular Infra - GAA 2024 SSP24FC0040
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MATOGDON RIVER FLOOD MITIGATION STRUCTURE IN BR
Flood Control and Drainage · On-Going · EUS CONSTRUCTION (21878)
Mabilo IIRegular Infra - GAA 2024 OO-224F00104
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0299+000 - K0299+291. K0299+821-K0300+000, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)
GAA 2024 OO-1 · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243)
Bagong Silang IRegular Infra - GAA 2024 OO-124F00029
CLUSTER III-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: III-I-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS MAHARLIKA HIGHWAY (LZ)-K0287+240-K0287+323.25; III-II-REHABILI
Roads · On-Going · A3 CONSTRUCTION & SUPPLY (39671)
CanapawanRegular Infra - GAA 2024 SSP24F00389
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0305+406-K0305+880, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT
Roads · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243)
MacogonRegular Infra - GAA 2024 OO-124F00030
CONSTRUCTION OF BRIDGE, BARANGAY EXCIBAN, LABO, CAMARINES NORTE
Bridges · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) / BRENTMIN ROOFING ENTERPRISE (37191)
ExcibanRegular Infra - GAA 2024 SSP24FC0059
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0311+260-K0311+591, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)
Roads · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243)
DaguitRegular Infra - GAA 2024 OO-124F00031
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0302+103-K0302+280, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT
Roads · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243)
Bagong Silang IRegular Infra - GAA 2024 OO-124F00028
CONSTRUCTION OF 2STY4CL (TWO STOREY FOUR CLASSROOM), MALAYA INTEGRATED SCHOOL, LABO, CAMARINES NORTE
Buildings and Facilities · On-Going · GREAT WALL ENGINEERING (34573)
MalayaOutside Infra - GAA 2024 DepEd BEFF24FC0063
CONCRETING OF BRGY. MAHAWAN-HAWAN FMR, BRGY. MAHAWAN-HAWAN, LABO, CAMARINES NORTE
Roads · On-Going · GREAT WALL ENGINEERING (34573)
Mahawan-hawanOutside Infra - GAA 2024 DA FMR24FC0047
CONCRETING OF BRGY. EXCIBAN FMR, BRGY. EXCIBAN, LABO, CAMARINES NORTE
Roads · On-Going · GREAT WALL ENGINEERING (34573)
ExcibanOutside Infra - GAA 2024 DA FMR24FC0057
CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. PINYA, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · SHEAR CONSTRUCTION AND SUPPLY (34027)
Pinya (Pob.)Regular Infra - GAA 2024 SSP24FC0041
CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. CABUSAY, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · SUNRISE0124 CIVIL ENGINEERING CONSTRUCTION (55276)
CabusayRegular Infra - GAA 2024 SSP24FC0042
CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BAGONG SILANG II HIGH SCHOOL, BARANGAY BAGONG SILANG II, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
Bagong Silang IIRegular Infra - GAA 2024 SSP24FC0021
CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER, BARANGAY DAGUIT, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
DaguitRegular Infra - GAA 2024 SSP24FC0025
CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) FLORENCE ELEMENTARY SCHOOL, BARANGAY GUISICAN, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
GuisicanRegular Infra - GAA 2024 SSP24FC0016
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAAY ELEMENTARY SCHOOL, BARANGAY BAAY, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
BaayRegular Infra - GAA 2024 SSP24FC0020
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TALOBATIB, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000)
TalobatibRegular Infra - GAA 2024 SSP24FC0023
CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PAG ASA HIGH SCHOOL, BARANGAY PAG ASA, LABO, CAMARINES NORTE
Buildings and Facilities · Completed · R & E BUILDERS & SUPPLY (45768)
Pag-AsaRegular Infra - GAA 2024 SSP24FC0015
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG DAANG MAHARLIKA RD (LZ)(S03784LZ)-K0325+678-K0326+633, LABO, CAMARINES NORTE, LABO, CAM
Roads · Completed · RAGINMUND CONSTRUCTION (47190)
MasalongRegular Infra - GAA 2024 SSP24F00313
| ₱144,749,981.54 |
| 2024 |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE III), BRGY. MATANLANG, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105) | Matanlang | ₱144,749,835.75 | 2024 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 5), BRGY. MATANLANG, LABO, CAMARINES NORTEFlood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) | Benit | ₱144,749,743.10 | 2024 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 6), BRGY. MATANLANG, LABO, CAMARINES NORTEFlood Control and Drainage · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) | Benit | ₱144,749,646.56 | 2024 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE II), BRGY. LUGUI, LABO, CAMARINES NORTEFlood Control and Drainage · On-Going · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105) | Lugui | ₱144,749,351.14 | 2024 |
|---|
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE I), BRGY. LUGUI, LABO, CAMARINES NORTEFlood Control and Drainage · Completed · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105) | Lugui | ₱144,738,963.38 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOGUnprogrammed Appropriations 2024 · On-Going · EUS CONSTRUCTION (21878) | Mabilo II | ₱140,406,339.00 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY MALATAP, LABO, CAMARINFlood Control and Drainage · Completed · EUS CONSTRUCTION (21878) | Malatap | ₱115,778,364.85 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION)PACKAGE 1, CAMARINES NORTE, LABO, CAMARINES NORTE (1ST LEGISLATIVERoads · On-Going · EUS CONSTRUCTION (21878) | Exciban | ₱87,141,077.58 | 2024 |
|---|
| CONSTRUCTION OF ROAD, BARANGAY MALANCAO, BASUD, LABO CAMARINES NORTE (PHASE 1), BARANGAY MALANGCAO-BASUD, LABO, CAMARINES NORTERoads · On-Going · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105) | Malangcao-Basud | ₱76,710,510.84 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MATOGDON RIVER FLOOD MITIGATION STRUCTURE IN BRFlood Control and Drainage · On-Going · EUS CONSTRUCTION (21878) | Mabilo II | ₱69,841,727.80 | 2024 |
|---|
| CONSTRUCTION OF BRIDGE, BARANGAY CALABASA, LABO, CAMARINES NORTEBridges · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) / BRENTMIN ROOFING ENTERPRISE (37191) | Malangcao-Basud | ₱47,528,451.44 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MATOGDON RIVER FLOOD MITIGATION STRUCTURE IN BRFlood Control and Drainage · On-Going · EUS CONSTRUCTION (21878) | Mabilo II | ₱46,561,453.80 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0299+000 - K0299+291. K0299+821-K0300+000, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)GAA 2024 OO-1 · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) | Bagong Silang I | ₱45,495,323.55 | 2024 |
|---|
| CLUSTER III-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: III-I-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS MAHARLIKA HIGHWAY (LZ)-K0287+240-K0287+323.25; III-II-REHABILIRoads · On-Going · A3 CONSTRUCTION & SUPPLY (39671) | Canapawan | ₱40,898,768.60 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0305+406-K0305+880, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICTRoads · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) | Macogon | ₱36,497,240.00 | 2024 |
|---|
| CONSTRUCTION OF BRIDGE, BARANGAY EXCIBAN, LABO, CAMARINES NORTEBridges · On-Going · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778) / BRENTMIN ROOFING ENTERPRISE (37191) | Exciban | ₱29,699,705.07 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0311+260-K0311+591, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)Roads · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) | Daguit | ₱22,859,711.90 | 2024 |
|---|
| ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0302+103-K0302+280, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICTRoads · On-Going · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243) | Bagong Silang I | ₱18,437,855.16 | 2024 |
|---|
| CONSTRUCTION OF 2STY4CL (TWO STOREY FOUR CLASSROOM), MALAYA INTEGRATED SCHOOL, LABO, CAMARINES NORTEBuildings and Facilities · On-Going · GREAT WALL ENGINEERING (34573) | Malaya | ₱18,288,100.35 | 2024 |
|---|
| CONCRETING OF BRGY. MAHAWAN-HAWAN FMR, BRGY. MAHAWAN-HAWAN, LABO, CAMARINES NORTERoads · On-Going · GREAT WALL ENGINEERING (34573) | Mahawan-hawan | ₱14,924,999.07 | 2024 |
|---|
| CONCRETING OF BRGY. EXCIBAN FMR, BRGY. EXCIBAN, LABO, CAMARINES NORTERoads · On-Going · GREAT WALL ENGINEERING (34573) | Exciban | ₱14,924,999.05 | 2024 |
|---|
| CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. PINYA, LABO, CAMARINES NORTEBuildings and Facilities · Completed · SHEAR CONSTRUCTION AND SUPPLY (34027) | Pinya (Pob.) | ₱4,949,996.71 | 2024 |
|---|
| CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. CABUSAY, LABO, CAMARINES NORTEBuildings and Facilities · Completed · SUNRISE0124 CIVIL ENGINEERING CONSTRUCTION (55276) | Cabusay | ₱4,949,995.51 | 2024 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BAGONG SILANG II HIGH SCHOOL, BARANGAY BAGONG SILANG II, LABO, CAMARINES NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Bagong Silang II | ₱4,949,992.98 | 2024 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER, BARANGAY DAGUIT, LABO, CAMARINES NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Daguit | ₱4,949,988.24 | 2024 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) FLORENCE ELEMENTARY SCHOOL, BARANGAY GUISICAN, LABO, CAMARINES NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Guisican | ₱4,949,988.20 | 2024 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAAY ELEMENTARY SCHOOL, BARANGAY BAAY, LABO, CAMARINES NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Baay | ₱4,949,970.06 | 2024 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TALOBATIB, LABO, CAMARINES NORTEBuildings and Facilities · Completed · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY (39000) | Talobatib | ₱4,949,338.86 | 2024 |
|---|
| CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PAG ASA HIGH SCHOOL, BARANGAY PAG ASA, LABO, CAMARINES NORTEBuildings and Facilities · Completed · R & E BUILDERS & SUPPLY (45768) | Pag-Asa | ₱4,801,473.59 | 2024 |
|---|
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG DAANG MAHARLIKA RD (LZ)(S03784LZ)-K0325+678-K0326+633, LABO, CAMARINES NORTE, LABO, CAMRoads · Completed · RAGINMUND CONSTRUCTION (47190) | Masalong | ₱3,531,529.00 | 2024 |
|---|